05.03.2024 Elite Family Residence Work on the pool is underway. Fireplace masonry work continues on the 6th (5th) floor. On the floors, the bases for balcony railings are being installed. - European Village

05.03.2024 Elite Family Residence Work on the pool is underway. Fireplace masonry work continues on the 6th (5th) floor. On the floors, the bases for balcony railings are being installed.