07.03.2024 Elite Family Residence The installation of a swimming pool continues on the property. Fireplace masonry is underway on the 6th (5th) floor. On the floors, the bases for balcony railings and the installation of internal power supply networks are being assembled. - European Village

07.03.2024 Elite Family Residence The installation of a swimming pool continues on the property. Fireplace masonry is underway on the 6th (5th) floor. On the floors, the bases for balcony railings and the installation of internal power supply networks are being assembled.