10.03.2024 Elite Family Residence Construction of bases for balcony railings is underway, as well as masonry fireplaces on the 6th construction (5th residential) floor. Work is underway to install a swimming pool. - European Village

10.03.2024 Elite Family Residence Construction of bases for balcony railings is underway, as well as masonry fireplaces on the 6th construction (5th residential) floor. Work is underway to install a swimming pool.