17.03.2024 Wyndham Grand Residences Batumi Gonio. Riviera Excavation work continues for the foundation excavation for the infrastructure building. In Block A, the walls are being laid with ceramic block and geodetic marking is underway. In Block B - reinforcement of basement floor walls. - European Village

17.03.2024 Wyndham Grand Residences Batumi Gonio. Riviera Excavation work continues for the foundation excavation for the infrastructure building. In Block A, the walls are being laid with ceramic block and geodetic marking is underway. In Block B – reinforcement of basement floor walls.