17.05.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, the laying of walls with ceramic block continues. Concreting of the floor slab has been carried out in Block B. Excavation work is underway in Block C. Concreting of columns has been completed in the Infrastructure Building.