22.05.2024 Wyndham Grand Residences Batumi Gonio. Riviera Wall masonry with ceramic block is underway on the 1st floor of Block A. Reinforcement of the floor slab is underway in Block B. Earthworks are in Block C. Slab formwork installation is underway at the infrastructure building.