02.04.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, the walls are being masoned with ceramic block. Concreting of the second stage of vertical structures took place in Block B. As well as concreting the foundation of the infrastructure building. Land work is underway.