02.08.2024 Elite Family Residences Painting works in mocap, on 2 construction (1 residential) and 3 (2) floors are in progress. Facade works, installation of apartment electrical panels, screed and storm water drainage are being carried out. Also being carried out is cladding of GKL shafts, installation of low-current water fire extinguishing systems, installation of water fire extinguishing system pipes and installation of gas silicate block on the -1 floor.