Wyndham Grand Batumi Gonio. Family Club Block B On the 2nd and 3rd floors the walls are being laid with ceramic block. Fireplaces are being laid, stained-glass windows support sides are being filled, staircase formwork is being dismantled and installed Block C Ceramoblock walls are being laid on the 1st floor.