03.08.2024 Elite Family Residences Painting works are being carried out in the mocap and on the 4th construction (3 residential) floor. Facade works, installation of apartment electric boards, storm water drainage and covering of shafts with GKL are being carried out. Also the device of low-current water fire extinguishing systems, installation of water fire extinguishing system pipes and the device of gas silicate block on the -1 floor.