03.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua We started installing the formwork for the slab on the 14th construction (13th hotel) floor. The construction of ceramic block walls is underway on the 2nd & 3rd construction (1st & 2nd hotel) floors.