Wyndham Grand Batumi Gonio. Aqua On the 2nd floor: – Installation of GKL partitions On the 3rd floor: – Installation of plumbing in mockup On the 13th floor: – Colouring of balconies in mockup On the floors works are performed: – Installation of formwork and framing of reinforced concrete sides of balconies – Installation of decorative boxes on balconies – Installation of stained glass – Dusting of ceilings – Installation of entrance group – Anticorrosive works (metal painting) – Diamond drilling of engineering holes – Arrangement of lift shaft coverings (preparation for installation of lift equipment). On the territory there are geodesic works, glass units are lifted to the floors.