06.03.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, the laying of walls with ceramic block has been started. The loading of the block onto the floors continues. In Block B, reinforcement of the 2nd stage of the foundation slab is underway. Excavation works are being carried out in Block C. The masonry of walls and partition walls made of ceramic block is carried out in block E. - European Village

06.03.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, the laying of walls with ceramic block has been started. The loading of the block onto the floors continues. In Block B, reinforcement of the 2nd stage of the foundation slab is underway. Excavation works are being carried out in Block C. The masonry of walls and partition walls made of ceramic block is carried out in block E.