07.09.2024 Wyndham Grand Residences Batumi Gonio. Aqua Balconies are being framed with reinforced concrete edges, ceilings are being dusted, plasterboard framework of internal partitions is being installed, and diamond drilling of engineering holes in floor slabs is being carried out. Stained glass windows are being installed. On the 20th floor, ceramic block walls continue to be laid.