07.12.2023 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, work continues on the formwork for the floor slab of the 3rd floor. The installation of lighting on the floors has begun. Excavation works are being carried out in Block B. In Block E, preparatory work is underway to lay the walls and install the roof. The installation of lighting on the floors has begun. - European Village

07.12.2023 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, work continues on the formwork for the floor slab of the 3rd floor. The installation of lighting on the floors has begun. Excavation works are being carried out in Block B. In Block E, preparatory work is underway to lay the walls and install the roof. The installation of lighting on the floors has begun.