08.05.2024 Wyndham Grand Residences Batumi Gonio. Family Club Concreting of the 2nd stage of staircases was carried out on the 5th floor of block A. On the 1st floor the walls continue to be laid with ceramic block. In block B, the floor slab formwork is being installed.