08.08.2024 Wyndham Grand Residences Batumi Gonio. Aqua Ceramoblock walls continue to be laid on the 1st construction (Ground Floor) floor. Balcony framing and dusting of ceilings in common areas are in progress. Also, technological openings in floor slabs are being made, geological surveys are being conducted at the site of the aqua-zone, installation of stained glass filling of the standard floor and installation of the GKL framework.