08.08.2024 Wyndham Grand Residences Batumi Gonio. Riviera Fireplaces are being laid in Block A. In Block B, the ceramic block walls are being laid and the floor slab formwork is being installed. In Block C, the installation of formwork for vertical structures is in progress. Installation of technological openings in the roof is underway in Block E.