08.09.2024 Elite Family Residence Preparation of the lift shaft, installation of metal railings and digging of a trench for the external sewerage system are in progress. The walls are being finished in the mockup. - European Village

08.09.2024 Elite Family Residence Preparation of the lift shaft, installation of metal railings and digging of a trench for the external sewerage system are in progress. The walls are being finished in the mockup.