09.03.2024 Wyndham Grand Residences Batumi Gonio. Family Club Installation of the formwork for the floor slab of the 5th floor of Block A continues. In Block B, concreting of the basement vertical structures took place, and the formwork for the third stage of the basement walls and the floor slab at 0.00 is being installed. - European Village

09.03.2024 Wyndham Grand Residences Batumi Gonio. Family Club Installation of the formwork for the floor slab of the 5th floor of Block A continues. In Block B, concreting of the basement vertical structures took place, and the formwork for the third stage of the basement walls and the floor slab at 0.00 is being installed.