15.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua Concreting of the columns took place on the 14th construction (13 hotel) floor. On the 5th (4th) floor, block wall masonry has started, on the 3rd(2) and 4th(3) this type of work continues.