10.08.2024 Elite Family Residence Painting works are in progress on the mockup, as well as on 2 construction (1 residential) and 3 construction (2 residential) floors. Laying of porcelain stoneware in the mockup is in progress. Works on facades and GPB in common areas, installation of low-current systems and installation of water fire extinguishing system pipes are being carried out. On the -1 floor is laying of gas silicate block.