10.12.2023 Elite Family Residence On the 5th construction (4 residential) and 6th (5) floors, the walls are being masoned with ceramic block. - European Village

10.12.2023 Elite Family Residence On the 5th construction (4 residential) and 6th (5) floors, the walls are being masoned with ceramic block.