11.03.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, the masonry block on the floors is underway. In Block B, reinforcement of the 2nd stage of the foundation slab continues. Excavation works are being carried out in Block C. In Block E, the walls are masonry with ceramic block.