11.04.2024 Wyndham Grand Residences Batumi Gonio. Family Club Preparation for concreting of the floor slab of the 5th floor was carried out in Block A. In Block B, dismantling of the column formwork, installation of waterproofing and insulation of the underground part of the foundation is in progress.