11.12.2023 Elite Family Residence Ceramic block walls are being laid on the 5th construction (4 residential) and 6th (5) floors. - European Village

11.12.2023 Elite Family Residence Ceramic block walls are being laid on the 5th construction (4 residential) and 6th (5) floors.