12.04.2024 Wyndham Grand Residences Batumi Gonio. Family Club Concreting of the floor slab of the 5th floor has taken place in Block A. In Block B, the installation of formwork for vertical structures, installation of waterproofing and insulation for the underground part of the foundation is in progress.