12.12.2023 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab continues on the 19th construction (18 hotel) floor. On 11 (10) the walls are being laid with ceramic block. - European Village

12.12.2023 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab continues on the 19th construction (18 hotel) floor. On 11 (10) the walls are being laid with ceramic block.