13.12.2023 Elite Family Residence Ceramic block masonry walls are being laid on the 5th building (4 residential) as well as on the 6th (5) and 7th (6) floors. - European Village

13.12.2023 Elite Family Residence Ceramic block masonry walls are being laid on the 5th building (4 residential) as well as on the 6th (5) and 7th (6) floors.