14.08.2024 Wyndham Grand Residences Batumi Gonio. Family Club Ceramoblock walls continue to be laid in Blocks A and B. In addition, the formwork for the floor slab is being assembled in Block B. - European Village

14.08.2024 Wyndham Grand Residences Batumi Gonio. Family Club Ceramoblock walls continue to be laid in Blocks A and B. In addition, the formwork for the floor slab is being assembled in Block B.