15.02.2024 Wyndham Grand Residences Batumi Gonio. Riviera Connection of the facility to the city water supply has begun. Block A - dismantling of the floor slab formwork Block B - reinforcement of the foundation slab Block E - laying of walls with ceramic block - European Village

15.02.2024 Wyndham Grand Residences Batumi Gonio. Riviera Connection of the facility to the city water supply has begun. Block A – dismantling of the floor slab formwork Block B – reinforcement of the foundation slab Block E – laying of walls with ceramic block