15.08.2023 - Wyndham Grand Residences Batumi Gonio. Riviera - Block A: The columns and structural wall are being stripped from the formwork. Block E: The formwork of stairs is underway. - European Village

15.08.2023 – Wyndham Grand Residences Batumi Gonio. Riviera – Block A: The columns and structural wall are being stripped from the formwork. Block E: The formwork of stairs is underway.