16.01.2024 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab has begun on the 20th construction (19th hotel) floor. On 13 (12) the ceramic block walls are being laid. - European Village

16.01.2024 Wyndham Grand Residences Batumi Gonio. Aqua Reinforcement of the floor slab has begun on the 20th construction (19th hotel) floor. On 13 (12) the ceramic block walls are being laid.