17.08.2023 Wyndham Grand Residences Batumi Gonio. Aqua The reinforcement of columns and the installation of guiderails are underway on the 12th construction (11th hotel) floor. The wall construction is ongoing on the 2nd construction (1st hotel) floor; the delivery of construction materials is in process on the 3rd construction (2nd hotel)