17.11.2023 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, the installation of formwork for the first floor slab (first half of the block) and reinforcement of the first floor vertical structures (second half of the block) continues. The wall drainage is carried out. Land work is ongoing.