17.12.2023 Wyndham Grand Residences Batumi Gonio. Riviera In Block A on the 3rd floor, work continues on the installation of vertical structures. The installation of lighting is underway. Land works are underway in Block B. In Block E, the masonry of the parapet with ceramic block on the roof continues.