18.03.2024 Elite Family Residence Reinforcing of the pool area walls continues on the property. The internal electrical and lighting systems are installed on the floors, and the openings for the installation of window units are measured. - European Village

18.03.2024 Elite Family Residence Reinforcing of the pool area walls continues on the property. The internal electrical and lighting systems are installed on the floors, and the openings for the installation of window units are measured.