18.08.2024 Wyndham Grand Residences Batumi Gonio. Aqua The facility continues pouring concrete sides (frames) of balconies and their waterproofing, installation of gypsum cardboard frame of internal partitions, installation of construction waste chute, drilling of technological holes in floor slabs, dusting of ceilings in common areas, sealing of holes on the staircase. Ceramoblock walls are being laid on the 20th floor.