18.10.2023 Wyndham Grand Residences Batumi Gonio. Aqua Installation of column formwork is underway on the 16th construction (15th hotel) floor. On 6 (5), masonry walls continue to be built. Building materials are being loaded on floors 7(6) and 14 (13).