19.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua On the 15th construction (14 hotel) floor, work continues on the installation of the floor slab formwork. In parallel, on the 5th (4) and 4th (3) floors the walls are being laid with ceramic block.