19.09.2024 Elite Family Residence Facade works, laying of external sewerage pipes, installation of plasterboard framework of internal partitions, installation of metal fences, diamond drilling of holes and geodetic drawing of facade lines are continuing. On the ground floor there is wall finishing and electrical installation works – light wiring, installation of inductors. On the first floor – wall finishing. On the third and fourth floors – checking the integrity of cables.