21.09.2023 Wyndham Grand Residences Batumi Gonio. Aqua The reinforcement of the floor slab of the 15th construction (14th hotel) floor is being carried out. Ceramic block walls are being laid on floors 4(3) and 5(4), with building materials being loaded on floor 6(5).