22.08.2024 Wyndham Grand Residences Batumi Gonio. Aqua The facility continues to pour concrete sides (frames) of balconies and their waterproofing, installation of gypsum cardboard framework of internal partitions, drilling of technological holes in floor slabs, dusting of ceilings in common areas. The facade of the building is being insulated. Ceramoblock walls are being laid on the 20th floor.