22.10.2023 Wyndham Grand Residences Batumi Gonio. Aqua On the 16th construction (15th hotel) floor, the concreting of the columns has taken place. On 7 (6), masonry walls continue to be laid with ceramic block. On 14 (13), the masonry of the walls with ceramic block has started.