23.08.2024 Elite Family Residence Facade works, installation of air-conditioning routes and decorative elements of the facade continue. Plasterboard ceilings are being installed. The pumping equipment of the water fire extinguishing system is being tied in and individual system tests are being carried out. Painting works are being carried out on the first floor.