24.09.2024 Wyndham Grand Residences Batumi Gonio. Villas Villas 8-9: construction of the floor slab formwork. Villa 12: reinforcement of the bottom of the foundation. Villas 15-16: formwork for the foundation under-concrete and geodetic work. Geodetic surveying of the formwork is also in progress: columns (villas 3, 5), foundation walls (villas 11, 13), floor slabs (villas 6-9). Concreting of the fence foundation is in progress. - European Village

24.09.2024 Wyndham Grand Residences Batumi Gonio. Villas Villas 8-9: construction of the floor slab formwork. Villa 12: reinforcement of the bottom of the foundation. Villas 15-16: formwork for the foundation under-concrete and geodetic work. Geodetic surveying of the formwork is also in progress: columns (villas 3, 5), foundation walls (villas 11, 13), floor slabs (villas 6-9). Concreting of the fence foundation is in progress.