24.10.2023 Wyndham Grand Residences Batumi Gonio. Aqua Installation of the formwork for the floor slab of the 17th construction (16th hotel) floor has started. The laying of walls with ceramic block on floors 6 (5), 7 (6) and 14 (13) continues.