25.03.2024 Wyndham Grand Residences Batumi Gonio. Riviera Concreting of the foundation preparation of the infrastructure building has been carried out. Surveying of construction axes and block laying on the floors is underway in Block A. In Block B, formwork installation of the 1st stage of vertical structures and reinforcement of the 2nd stage of the foundation slab continues. Excavation works are being carried out in Block C.