26.04.2024 Wyndham Grand Residences Batumi Gonio. Family Club On the 5th floor of block A the installation of the floor slab formwork is in progress, on the 1st floor the laying of walls with ceramic block continues. In Block B, reinforcement and installation of column formwork is underway.