26.08.2024 Elite Family Residence Air-conditioning routes are being installed. Stained glass windows are being installed. Facade works and installation of plasterboard ceiling framework are in progress. Technical rooms of the ground floor are being plastered. Laying of porcelain tile flooring has begun. Electrical installation works are underway on the second floor. Metal railings are delivered to the object, their installation is in progress. Geodetic layout for the railing is being carried out. Cement and decorative facade elements have been delivered to the site.